-
Notifications
You must be signed in to change notification settings - Fork 10
docs_powercase_start
peter edited this page May 14, 2025
·
2 revisions

Order your OpenBuilds PowerCase with 24v Meanwell PSU
Before connecting your power supply to mains power, it is critical that you check and set the 115v/230v Switch on the right-side of the PSU:

Look out for the bright yellow sticker on the top, to help you locate the switch:

The following video demonstrates the assembly of an OpenBuilds PowerCase