Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
11 changes: 6 additions & 5 deletions docs/overhaul-execution-runbook.md
Original file line number Diff line number Diff line change
Expand Up @@ -122,12 +122,13 @@ Goal: establish one exact safe baseline before launch work resumes.
- [x] Confirm required checks, protected branches, and immutable dispatch-tag
protections match current operating needs.

Current `main` baseline:
Verified functional baseline. Documentation-only current-state commits may be
newer without changing this runtime and data baseline.

| Repository | Commit | Protection state |
| --- | --- | --- |
| `lean-eval` | `5ed990bac00e75a117f58cbb2963a71378497f36` | Required `verify` |
| `lean-eval-submissions` | `4a1d14eb433d938f8f923d340f80cad87cb2a8eb` | Required `verify` |
| `lean-eval` | `2ce34216e68afc833b3c11e3d60d76e3256e8505` | Required `verify` |
| `lean-eval-submissions` | `9f01ae0e2cf644437f7fe4c5a2a076436d2e6827` | Required `verify` |
| `lean-eval-leaderboard` | `d67705cf4bbd34635251adcc4aa4bcff7ee622da` | Required `build` |
| `lean-eval-state` | `15a96673efd44d3b198890c1e94581b33c2a1a87` | Required `validate`; append-only |
| `lean-eval-state-staging` | `bb12184a9fbdf5cb4fd11420a16e874d07ae1938` | Required `validate`; append-only |
Expand All @@ -150,7 +151,7 @@ Current `main` baseline:
### 5.3 State, credentials, and presentation

- [x] Verify protected State heads and validation status.
- [ ] Inventory credential names, owners, scopes, expiry, rotation, and
- [x] Inventory credential names, owners, scopes, expiry, rotation, and
revocation without exposing values.
- [x] Confirm production State contains no unexpected accepted server
submission or due release work.
Expand Down Expand Up @@ -424,7 +425,7 @@ Update this table in place; do not append a history beneath it.
| Phase | State | Current blocker |
| --- | --- | --- |
| 0. Rebaseline cleanup | Complete | — |
| 1. Disabled baseline | In progress | Credential inventory |
| 1. Disabled baseline | Complete | — |
| 2. Repository launch preparation | In progress | Approval A and the exact-version staging rehearsal |
| Approval A. Staging credentials | Blocked on explicit approval | Exact staging trust mutation prepared but unapplied |
| 3. Final staging acceptance | Not started | Approval A |
Expand Down