test_fixtures: sync Cargo.lock to 0.1.0 (unblock publish) - #530
Conversation
PR #529 bumped rainlang_test_fixtures from 0.0.0 to 0.1.0 (made it publishable) but didn't update Cargo.lock. The Package Release build then regenerated the lock and `cargo release` aborted on the dirty tree ("uncommitted changes detected: Cargo.lock"), so nothing published. Commit the matching lock entry so the release runs clean. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
|
Important Review skippedReview was skipped due to path filters ⛔ Files ignored due to path filters (1)
CodeRabbit blocks several paths by default. You can override this behavior by explicitly including those paths in the path filters. For example, including ⚙️ Run configurationConfiguration used: Path: .coderabbit.yaml Review profile: CHILL Plan: Pro Run ID: You can disable this status message by setting the Use the checkbox below for a quick retry:
✨ Finishing Touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
|
@coderabbitai assess this PR size classification for the totality of the PR with the following criterias and report it in your comment: S/M/L PR Classification Guidelines:This guide helps classify merged pull requests by effort and complexity rather than just line count. The goal is to assess the difficulty and scope of changes after they have been completed. Small (S)Characteristics:
Review Effort: Would have taken 5-10 minutes Examples:
Medium (M)Characteristics:
Review Effort: Would have taken 15-30 minutes Examples:
Large (L)Characteristics:
Review Effort: Would have taken 45+ minutes Examples:
Additional Factors to ConsiderWhen deciding between sizes, also consider:
Notes:
|
Follow-up to #529. That PR made
rainlang_test_fixturespublishable (0.0.0→0.1.0) but didn't updateCargo.lock, so the Package Release run regenerated the lock during the build andcargo releaseaborted on the dirty tree:Nothing published (it failed before the publish step). This commits the matching lock entry so the release runs clean. Verified
cargo metadata --lockedpasses (only the singleversionline changed). Merging re-triggers the lockstep publish.