Skip to content

chore(deps): lock file maintenance - #202

Open
renovate[bot] wants to merge 1 commit into
masterfrom
renovate/lock-file-maintenance
Open

chore(deps): lock file maintenance#202
renovate[bot] wants to merge 1 commit into
masterfrom
renovate/lock-file-maintenance

Conversation

@renovate

@renovate renovate Bot commented Jun 29, 2026

Copy link
Copy Markdown
Contributor

This PR contains the following updates:

Update Change
lockFileMaintenance All locks refreshed

🔧 This Pull Request updates lock files to use the latest dependency versions.


Configuration

📅 Schedule: (UTC)

  • Branch creation
    • "before 4am on Monday"
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

@pv-release-regent

pv-release-regent Bot commented Jun 29, 2026

Copy link
Copy Markdown
Contributor

Release Regent — projected release

If this PR is merged now, the next release will be v0.7.0.
(Projection based on commits since v0.6.0. Updates automatically when other PRs land.)

Note: Release PR for v0.7.0 is already open. This PR's changes will be included in a subsequent release.

Available commands

Command Effect
!release major Force at least a major version bump for this PR
!release minor Force at least a minor version bump
!release patch Force at least a patch version bump
!set-version X.Y.Z Pin the exact release version

@pv-merge-warden pv-merge-warden Bot added size:xl Extra large change type:chore Chore or maintenance task labels Jun 29, 2026
@codecov

codecov Bot commented Jun 29, 2026

Copy link
Copy Markdown

Codecov Report

✅ All modified and coverable lines are covered by tests.
✅ Project coverage is 82.55%. Comparing base (26390a7) to head (6810eba).
⚠️ Report is 5 commits behind head on master.

Additional details and impacted files
@@           Coverage Diff           @@
##           master     #202   +/-   ##
=======================================
  Coverage   82.54%   82.55%           
=======================================
  Files          92       92           
  Lines       22921    22921           
  Branches    22921    22921           
=======================================
+ Hits        18920    18922    +2     
+ Misses       3799     3798    -1     
+ Partials      202      201    -1     

☔ View full report in Codecov by Harness.
📢 Have feedback on the report? Share it here.

🚀 New features to boost your workflow:
  • ❄️ Test Analytics: Detect flaky tests, report on failures, and find test suite problems.

@renovate
renovate Bot force-pushed the renovate/lock-file-maintenance branch from 9f267e5 to 158d3a5 Compare July 21, 2026 02:37
@pv-merge-warden pv-merge-warden Bot added pr-validation: pending-stability PR is waiting for Renovate stability period size:xxl chore and removed size:xl Extra large change labels Jul 21, 2026
@renovate
renovate Bot force-pushed the renovate/lock-file-maintenance branch from 158d3a5 to e311e33 Compare August 2, 2026 09:50
@renovate
renovate Bot force-pushed the renovate/lock-file-maintenance branch from e311e33 to 6810eba Compare August 12, 2026 04:42
@pv-merge-warden

Copy link
Copy Markdown
## 📏 Pull Request Size Notice

This PR has been labeled as XXL as it contains 1840 lines of changes across 2 files.

Why does PR size matter?

Research shows that smaller PRs are:

  • Reviewed more thoroughly - reviewers can focus better on smaller changes
  • Catch more bugs - defect detection rates decrease significantly for large PRs
  • Merged faster - less time in review cycles
  • Easier to understand - simpler to reason about the changes

💡 Consider breaking this PR into smaller pieces

Large PRs can be challenging to review effectively. Consider:

  1. Separate concerns - Split unrelated changes into different PRs
  2. Incremental changes - Break features into smaller, logical steps
  3. Preparatory PRs - Create setup/refactoring PRs before the main feature
  4. Documentation separately - Move documentation updates to separate PRs

Size Breakdown

  • Total lines changed: 1840
  • Files modified: 2
  • Category: XXL (Extra Extra Large - Should be split for better reviewability)

This is an automated message to help improve code review quality. If you believe this PR cannot be reasonably split, please add a comment explaining why.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

chore pr-validation: pending-stability PR is waiting for Renovate stability period size:xxl status:in-review type:chore Chore or maintenance task

Projects

None yet

Development

Successfully merging this pull request may close these issues.

0 participants