Milestones
List view
Unscheduled track for issues that consume policy-writing or exploration bandwidth rather than release engineering (issue 99 section 3). No due date by design; items graduate to a release milestone when they become engineering work.
No due date•0/9 issues closedwashr package v1.2.0: workflow automation and generalization. washr is the engine, parameterized beyond openwashdata; fairenough capabilities port in. Plan: #79.
No due date•0/12 issues closedwashr package v1.1.0: harden the core, consolidate the FAIR layer. Decision-gated by #67, not date-gated; a core-only 1.1.0 with the FAIR layer deferred counts as success. Plan: #79.
Due by October 23, 2026•4/17 issues closed