Skip to content

Pull requests: openshift/origin

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

TRT-2061: Test disable etcd log analyzer approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29649 opened Apr 3, 2025 by neisw Draft
Revert "Add monitortest for elevated etcd disk fsync intervals" approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#29648 opened Apr 3, 2025 by dgoodwin Loading…
CNTRLPLANE-371: Use endpointslices in idling tests instead of deprecated endpoints approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#29647 opened Apr 3, 2025 by ardaguclu Loading…
gateway object test case for gatewayApiController vendor-update Touching vendor dir or related files
#29646 opened Apr 3, 2025 by melvinjoseph86 Loading…
TRT-2061: backport 4.18 approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29645 opened Apr 2, 2025 by neisw Loading…
NE:1970 e2e origin tests for gatewayApiController vendor-update Touching vendor dir or related files
#29644 opened Apr 2, 2025 by rhamini3 Loading…
[WIP] Automation creation of OCP-80983 do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#29640 opened Apr 2, 2025 by asahay19 Loading…
OCPEDGE-1675: feat: update some tests to account for the arbiter node jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29639 opened Apr 2, 2025 by eggfoobar Loading…
sample of gatewayapicontroller e2e tests do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. vendor-update Touching vendor dir or related files
#29638 opened Apr 2, 2025 by lihongan Draft
Trt 2061 throttle monitor startup refactor approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#29637 opened Apr 1, 2025 by neisw Draft
Draft Commit for gatewayAPIController featuregate do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#29636 opened Apr 1, 2025 by rhamini3 Draft
TRT-2061: brute throttling approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29635 opened Apr 1, 2025 by neisw Draft
Add communication matrix test under networking vendor-update Touching vendor dir or related files
#29633 opened Apr 1, 2025 by shirmoran Loading…
[release-4.18] Stabilize IPsec E2E tests
#29632 opened Apr 1, 2025 by pperiyasamy Loading…
OCPBUGS-53279: add failure case to skip in testPodSandboxCreation() approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#29631 opened Apr 1, 2025 by jluhrsen Loading…
NO-JIRA: Env override NETWORKING_E2E_BOND_MTU jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29630 opened Mar 31, 2025 by mgencur Loading…
WIP CNTRLPLANE-353: Add test which verifes that only short duration tests are present do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29629 opened Mar 31, 2025 by vrutkovs Loading…
TRT-2049: Track Watch Counts via Audit Events approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29628 opened Mar 28, 2025 by neisw Loading…
WIP: write to nodeLogs instead of e2e logs do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#29627 opened Mar 27, 2025 by rphillips Loading…
[release-4.12] OCPBUGS-54147: Add/remove team members to the OWNERS file for Builds approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/severity-moderate Referenced Jira bug's severity is moderate for the branch this PR is targeting. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#29622 opened Mar 24, 2025 by openshift-cherrypick-robot Loading…
OCPBUGS-37799: Disable:Broken for [sig-builds][Feature:Builds][Slow] can use private repositories as build input build using an HTTP token should be able to clone source code via an HTTP token jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29621 opened Mar 24, 2025 by kunalmemane Loading…
etcd fsync intervals approved Indicates a PR has been approved by an approver from all required OWNERS files.
#29620 opened Mar 22, 2025 by dgoodwin Loading…
MCO-1599: MCN impersonation tests do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#29619 opened Mar 21, 2025 by pablintino Draft
SDN-5217: Add EgressIP route advertisement test jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. vendor-update Touching vendor dir or related files
#29617 opened Mar 21, 2025 by pliurh Loading…
Allow multiple attempts in egress firewall test needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#29615 opened Mar 21, 2025 by ldoktor Loading…
ProTip! What’s not been updated in a month: updated:<2025-03-03.