Skip to content

fix: add info logger instead of error when catalog is not enabled#38253

Open
marslanabdulrauf wants to merge 2 commits intoopenedx:masterfrom
mitodl:marslan/6650-logger-for-catalog
Open

fix: add info logger instead of error when catalog is not enabled#38253
marslanabdulrauf wants to merge 2 commits intoopenedx:masterfrom
mitodl:marslan/6650-logger-for-catalog

Conversation

@marslanabdulrauf
Copy link
Copy Markdown
Contributor

@marslanabdulrauf marslanabdulrauf commented Mar 31, 2026

Related Ticket

https://github.com/mitodl/hq/issues/6650 (MIT Internal)

Description

Context: Catalog is optional so if its not enabled we should log error

This pull request makes a minor change to the logging level in the check_catalog_integration_and_get_user function. The log message for when Catalog Integration is not enabled has been changed from an error to an info level, which reduces noise in the error logs for expected conditions.

@openedx-webhooks openedx-webhooks added the open-source-contribution PR author is not from Axim or 2U label Mar 31, 2026
@openedx-webhooks
Copy link
Copy Markdown

Thanks for the pull request, @marslanabdulrauf!

This repository is currently maintained by @openedx/wg-maintenance-openedx-platform.

Once you've gone through the following steps feel free to tag them in a comment and let them know that your changes are ready for engineering review.

🔘 Get product approval

If you haven't already, check this list to see if your contribution needs to go through the product review process.

  • If it does, you'll need to submit a product proposal for your contribution, and have it reviewed by the Product Working Group.
    • This process (including the steps you'll need to take) is documented here.
  • If it doesn't, simply proceed with the next step.
🔘 Provide context

To help your reviewers and other members of the community understand the purpose and larger context of your changes, feel free to add as much of the following information to the PR description as you can:

  • Dependencies

    This PR must be merged before / after / at the same time as ...

  • Blockers

    This PR is waiting for OEP-1234 to be accepted.

  • Timeline information

    This PR must be merged by XX date because ...

  • Partner information

    This is for a course on edx.org.

  • Supporting documentation
  • Relevant Open edX discussion forum threads
🔘 Get a green build

If one or more checks are failing, continue working on your changes until this is no longer the case and your build turns green.

Details
Where can I find more information?

If you'd like to get more details on all aspects of the review process for open source pull requests (OSPRs), check out the following resources:

When can I expect my changes to be merged?

Our goal is to get community contributions seen and reviewed as efficiently as possible.

However, the amount of time that it takes to review and merge a PR can vary significantly based on factors such as:

  • The size and impact of the changes that it introduces
  • The need for product review
  • Maintenance status of the parent repository

💡 As a result it may take up to several weeks or months to complete a review and merge your PR.

Copy link
Copy Markdown
Contributor

@pdpinch pdpinch left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

👍

@mphilbrick211 mphilbrick211 moved this from Needs Triage to Ready to Merge in Contributions Apr 1, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

open-source-contribution PR author is not from Axim or 2U

Projects

Status: Ready to Merge

Development

Successfully merging this pull request may close these issues.

4 participants