Skip to content

Acceptance M1: Protocol Test Suite

Due by March 15, 2025 37% complete

When this milestone is complete, we’ll have bootstrapped Protocol engineers to be able to start writing their acceptance test gates/suites.

Deliverables:

  • This PRD
  • Write a set of sample tests for Protocol (Isthmus & Interop) acceptance suite(s) by supporting them:
  • Isthmus-go (eg. TestWithdrawalsRoot)
  • Isthmus-rust
  • Interop
  • Add any missing Devnet SDK capabil…

When this milestone is complete, we’ll have bootstrapped Protocol engineers to be able to start writing their acceptance test gates/suites.

Deliverables:

  • This PRD
  • Write a set of sample tests for Protocol (Isthmus & Interop) acceptance suite(s) by supporting them:
  • Isthmus-go (eg. TestWithdrawalsRoot)
  • Isthmus-rust
  • Interop
  • Add any missing Devnet SDK capabilities needed to support the initial Protocol test suite
Loading