Skip to content

backup code

backup code #3

Triggered via push October 19, 2024 11:42
Status Cancelled
Total duration 18m 14s
Billable time 38m
Artifacts

ci.yml

on: push
Matrix: build
Matrix: run-node
Fit to window
Zoom out
Zoom in

Annotations

7 errors
run-node (macos-latest)
Process completed with exit code 101.
run-node (ubuntu-latest)
The job was canceled because "macos-latest" failed.
build (macos-latest)
Process completed with exit code 101.
build (ubuntu-latest)
The job was canceled because "macos-latest" failed.
build (ubuntu-latest)
The operation was canceled.
build-docker
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
build-docker
The operation was canceled.