Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension


Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
6 changes: 3 additions & 3 deletions .github/workflows/spectral-oas-caller.yml
Original file line number Diff line number Diff line change
Expand Up @@ -35,8 +35,8 @@ permissions:
jobs:
spectral:
# Invoke the reusable PR validation workflow from the main branch of camaraproject/tooling
uses: camaraproject/tooling/.github/workflows/spectral-oas.yml@v0
uses: rartych/tooling/.github/workflows/spectral-oas.yml@main
# Spectral configuration from the tooling repository subfolder of /linting/config/ indicated by `configurations` variable
# If needed, you can specify a configuration from another subfolder of camaraproject/tooling/linting/config/ (uncomment below)
# with:
# configurations: api-name
with:
configurations: dev
14 changes: 7 additions & 7 deletions release-plan.yaml
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
# CAMARA Release Plan

Check failure on line 1 in release-plan.yaml

View workflow job for this annotation

GitHub Actions / validation / Validate

release-plan.yaml must change in its own PR

[P-022] release-plan.yaml was changed alongside 1 other file(s)%3A .github/workflows/spectral-oas-caller.yml. release-plan.yaml changes should be submitted in a dedicated PR so that any new validation findings remain clearly attributable to the release-plan change. | Suggestion%3A Split this PR%3A keep release-plan.yaml changes in a dedicated PR, and move the other listed files to a separate PR.
# This file declares release intentions for this repository.
# It replaces manual wiki tracking with automated tooling.
#
Expand All @@ -10,31 +10,31 @@
# Options: independent (default) | meta-release
release_track: meta-release
# Meta-release participation (update for next cycle when planning)
meta_release: Fall25
meta_release: Sync26

# Target CAMARA release tag.
# Initialized to the latest release; update when planning the next release.
# - New release cycle (increment first number, reset second to 1)
# - Progression in same cycle (increment second number)
target_release_tag: r3.3
target_release_tag: r4.1

# Release type being prepared (must be set before release can be triggered)
# Options: none | pre-release-alpha | pre-release-rc | public-release | maintenance-release
target_release_type: none
target_release_type: pre-release-rc

# Dependencies on Commonalities and ICM releases
# Update per ReleaseManagement requirements for each release cycle
dependencies:
commonalities_release: r3.4
identity_consent_management_release: r3.3
commonalities_release: r4.3
identity_consent_management_release: r4.2

# APIs in this repository
# - api_name: kebab-case identifier (must be filename in code/API_definitions/)
# - target_api_status: draft (no file yet) | alpha | rc | public
apis:
- api_name: call-forwarding-signal
target_api_version: 0.4.0
target_api_status: public
target_api_version: 0.5.0
target_api_status: rc
main_contacts:
- FabrizioMoggio
- bigludo7
Expand Down
Loading