-
Notifications
You must be signed in to change notification settings - Fork 2
chore(report): arwg - july 2026 #7
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
base: main
Are you sure you want to change the base?
Changes from all commits
File filter
Filter by extension
Conversations
Jump to
Diff view
Diff view
There are no files selected for viewing
| Original file line number | Diff line number | Diff line change |
|---|---|---|
| @@ -0,0 +1,83 @@ | ||
| # [Report] Accuracy & Reliability – July 2026 | ||
|
|
||
| **Working Group:** WG Accuracy & Reliability | ||
|
|
||
| **Reporting period:** July 2026 | ||
|
|
||
| **Chair(s):** Jordan Augé (Cisco) & Casper Nielsen (Diagrid) | ||
|
|
||
| **Date submitted:** 2026-07-31 | ||
|
|
||
| --- | ||
|
|
||
| ## Summary | ||
|
|
||
| - D1 (terminology/methodology support deliverable) moved from initial Google Docs drafting to a first complete GitHub PR draft for open review and iterative updates. | ||
| - Based on D1, ARWG contributed an initial set of terms to the shared Taxonomy & Landscape sheet. | ||
| - ARWG narrowed terminology work into staged review batches. | ||
| - D2 (enterprise gap-analysis deliverable) evolved from benchmark inventory toward practitioner-priority analysis (personas, requirements, and practical gaps that block direct reuse by practitioners). | ||
|
|
||
| ## Progress Against Objectives | ||
|
|
||
| - **Taxonomy / cross-WG alignment** | ||
| - ARWG representatives participated in cross-WG meetings. | ||
| - ARWG contributed an initial set of terms (based on D1) to the shared Taxonomy & Landscape sheet. | ||
| - Submitted terms include ARWG-specific terminology, terms better handled by other WGs, and generic/common terms in the broader taxonomy; feedback in meetings asked for a tighter top-10 priority set because term-by-term discussion can be long. | ||
| - **Terminology execution model** | ||
| - Internal work was split into 3 milestones with an initial priority subset. Focus was on terms owned by the WG. | ||
|
Contributor
There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. Where can i find the milestones? |
||
| - Scope-control evidence: M1 currently has 41 terms that are central to the D1 structure; 23 are the main focus terms (WG-specific, not well defined or conflictual in literature, or ambiguous), while the rest are more trivial/common terms. | ||
| - The focus terms cover different accuracy/reliability dimensions used to structure D1, such as outcome correctness, consistency across runs, robustness to perturbations, and operational reliability in real systems. | ||
| - Review rule: central parent sections are handled first; deeper leaves are addressed in later milestones. | ||
| - Milestones and progress tracking (Google Docs): <https://docs.google.com/document/d/13HPunOtlGkU0eBH8LRAEzaioVnrYXDd7-ylkOjPGI6Y/edit?tab=t.ckx8fboiqqfn#heading=h.7btffw5ivlz5> | ||
| - **D1** | ||
| - D1 was used as supporting methodology deliverable (approach + literature grounding for terminology). | ||
| - Initial draft was developed in Google Docs; first complete draft was submitted as a GitHub PR. | ||
| - Objective: continue in-repo iteration and elicit broader structured feedback. | ||
| - **D2** | ||
| - Scope reframed from benchmark survey to enterprise-focused gap analysis. | ||
| - Early finding: disconnect between available research/assets and directly reusable practitioner material. | ||
| - Current prioritization framing was based on personas, use cases, and pain points; concrete comparative data remained limited, which motivated the survey. | ||
| - Working cadence: an on-demand D2 sync (including survey work) ran in alternation with the main WG meeting. | ||
| - **I1 (liaison note)** | ||
| - Internal liaison document drafted. | ||
| - First contact established with Observability WG. | ||
| - Volunteers are being solicited for additional top-priority WG liaisons. | ||
|
|
||
| ## Blockers and Risks | ||
|
|
||
| - **Overall feedback volume remains low across work items (D1, D2, taxonomy, and related reviews)** | ||
| - Risk: slower convergence on canonical terms, weaker cross-WG adoption confidence, and slower prioritization closure. | ||
| - Seasonal effect: summer period and PTOs reduced review bandwidth and writing capacity. | ||
| - Note: despite low feedback volume overall, D1 already proved useful as input for D2 framing; D2 discussions gathered a small contributor group, but there are still few active writers. | ||
|
Comment on lines
+48
to
+51
Contributor
There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. What does low here mean? What's the engagement like. Let's keep an eye on this and ensure we track this over time and be honest with ourselves if the WG doesn't gain enough traction |
||
| - **D2 use-case grounding is not mature enough yet** | ||
| - Risk: priorities remain weakly anchored without a convincing shared practitioner use-case set. | ||
| - Constraint: contributors are at very different adoption stages (early vs very focused exploration), with different focus priorities (for example: cost, quality, and reliability). | ||
| - Mitigation in progress: prepare a short survey to rank pain points and converge on a top-priority use-case set. | ||
|
|
||
| ## Decisions Needed from the TC | ||
|
|
||
| - Confirm whether the TC recommends engagement mechanisms beyond PR-based review (PR flow improves traceability but may not significantly increase participation on its own). | ||
|
Contributor
There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. I think this is fine. We mostly look towards you to see what you need from us. I know everyone is strapped for time. Feel free to ping me in discord if you need a specific review. |
||
| - Validate D2 direction: practitioner-grounded prioritization (personas + enterprise requirements + actionable gaps), not benchmark-only analysis. | ||
| - Approve a short D2 survey to rank pain points and lock top use cases for the next cycle. | ||
|
|
||
| ## Next Month's Focus | ||
|
|
||
| 1. Following D1 GitHub PR, actively solicit review comments (2w deadline for first iteration). | ||
| 2. Finalize first milestone term subset and continue global-term promotion proposals, including a reduced top-10 discussion set. | ||
| 3. Run targeted survey to prioritize top practitioner pain points and use cases for D2 (finalize survey beg Sept) | ||
|
Contributor
There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. Who will be the audience for the survey and how to do you plan to reach out? |
||
| 4. Expand liaison coverage beyond Observability WG for top-priority interfaces. | ||
|
|
||
| ## Metrics / Links | ||
|
|
||
| - D1 reference: [D1-terminology-taxonomy/README.md](../D1-terminology-taxonomy/README.md) | ||
| - D2 reference: [D3-gap-analysis/README.md](../D3-gap-analysis/README.md) | ||
| - Liaison note: [taxonomy-landscape/taxonomy-wg-internal-liaison.md](../taxonomy-landscape/taxonomy-wg-internal-liaison.md) | ||
| - D1 GitHub PR link: to be added when published (planned in early August). | ||
| - D1 draft (Google Docs): <https://docs.google.com/document/d/13HPunOtlGkU0eBH8LRAEzaioVnrYXDd7-ylkOjPGI6Y/edit?tab=t.hd16wsudjqjh#heading=h.3212hz242hul> | ||
| - D2 gap analysis (Google Docs): <https://docs.google.com/document/d/13HPunOtlGkU0eBH8LRAEzaioVnrYXDd7-ylkOjPGI6Y/edit?tab=t.s0van0cuuukb> | ||
| - D2 survey draft (WIP): <https://docs.google.com/document/d/13HPunOtlGkU0eBH8LRAEzaioVnrYXDd7-ylkOjPGI6Y/edit?tab=t.bdppm6kz3vb#heading=h.r4gcap884sk0> | ||
| - Liaison bootstrap (Google Docs): <http://docs.google.com/document/d/13HPunOtlGkU0eBH8LRAEzaioVnrYXDd7-ylkOjPGI6Y/edit?tab=t.xpcnwbjxykmg#heading=h.fbf4bauklowm> | ||
| - Taxonomy internal milestones/progress (Google Docs): <https://docs.google.com/document/d/13HPunOtlGkU0eBH8LRAEzaioVnrYXDd7-ylkOjPGI6Y/edit?tab=t.ckx8fboiqqfn#heading=h.7btffw5ivlz5> | ||
| - Main running notes: <https://docs.google.com/document/d/13HPunOtlGkU0eBH8LRAEzaioVnrYXDd7-ylkOjPGI6Y/edit?tab=t.0> | ||
| - Cross-WG Taxonomy sheet: <https://docs.google.com/spreadsheets/d/1Oa-x7nBISIOuqaC-BnsQ1R-iPdwZ6Otk3dpWlqpI_z4/edit?gid=0#gid=0> | ||
| - Meeting notes and top-10 reduction feedback are captured in the main running notes (link above). | ||
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
Let's add links to the PRs.