352 ecdsa secp k1 support #2190
Triggered via pull request
February 27, 2025 16:14
Status
Cancelled
Total duration
2m 48s
Artifacts
–
pull-request.yml
on: pull_request
Verify Circuit Proof
/
Produce and verify proofs
1m 49s
Gcc release full Linux testing
/
Build and test Linux with gcc
1m 21s
Clang release full Linux testing
/
Build and test Linux with clang
2m 22s
Verify Hardhat Proofs
/
Verify hardhat proofs
1m 50s
Build and upload deb package
/
Build proof-producer deb package
2m 17s
Verify Circuit Proof
/
...
/
verify-proofs
Annotations
10 errors
Verify Circuit Proof / Produce and verify proofs
Canceling since a higher priority waiting request for 'PR Testing/refs/pull/353/merge' exists
|
Verify Circuit Proof / Produce and verify proofs
The operation was canceled.
|
Build and upload deb package / Build proof-producer deb package
Canceling since a higher priority waiting request for 'PR Testing/refs/pull/353/merge' exists
|
Build and upload deb package / Build proof-producer deb package
The operation was canceled.
|
Verify Hardhat Proofs / Verify hardhat proofs
Canceling since a higher priority waiting request for 'PR Testing/refs/pull/353/merge' exists
|
Verify Hardhat Proofs / Verify hardhat proofs
The operation was canceled.
|
Gcc release full Linux testing / Build and test Linux with gcc
Canceling since a higher priority waiting request for 'PR Testing/refs/pull/353/merge' exists
|
Gcc release full Linux testing / Build and test Linux with gcc
The operation was canceled.
|
Clang release full Linux testing / Build and test Linux with clang
Canceling since a higher priority waiting request for 'PR Testing/refs/pull/353/merge' exists
|
Clang release full Linux testing / Build and test Linux with clang
The operation was canceled.
|