Skip to content

Add Phase 6F and Phase 7 preflight foundations - #8

Draft
200lz wants to merge 8 commits into
mainfrom
codex/p7a-muse-glimmer-preflight-20260815
Draft

Add Phase 6F and Phase 7 preflight foundations#8
200lz wants to merge 8 commits into
mainfrom
codex/p7a-muse-glimmer-preflight-20260815

Conversation

@200lz

@200lz 200lz commented Aug 15, 2026

Copy link
Copy Markdown
Owner

Summary

  • add Phase 6F assurance-bundle interoperability
  • add Phase 7A smart preflight and Phase 7B runtime-compatibility foundations
  • add the Muse Glimmer 30B reference preflight acceptance case with a deterministic fixed-image probe
  • document the architecture, roadmap, and reference workflow

Why

This establishes the shortest usable OMIV path from inspection and preflight to a concise verdict, runtime plan, and assurance artifacts. Muse Glimmer is the first real release-driven acceptance case: any remaining manual step becomes concrete Phase 7 UX backlog.

Validation

Validated locally with the full offline test suite, Ruff, strict mypy, compileall, repository publication controls, and release audits.

Evidence boundaries

This PR adds deterministic preflight/reference artifacts and plans. It does not claim source-to-artifact provenance, semantic or numerical fidelity, performance, safety, production readiness, or a successful runtime execution.

Stacked follow-up

A separate draft PR adds external runtime-evidence ingestion on top of this branch. Keeping it stacked makes the seven-file ingestion change independently reviewable.

@200lz
200lz force-pushed the codex/p7a-muse-glimmer-preflight-20260815 branch from 9b05c60 to f85b0cd Compare August 15, 2026 23:26
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant