Skip to content

Add pressure drop constraints in size optimisation #414

@wouterpeere

Description

@wouterpeere

Currently, the method to calculate the required borefield size and depth takes into account all sort of geometrical parameters, but not any pressure drop related aspects, although this is also an important aspect in the decision which option to pick.

Therefore, in this aim, this method is extended to also take into account a maximum pressure drop across the borehole and/or horizontal connections. For this last one, an assumption has be made on the longest path from one borehole to the collector.

This will be implemented after #408

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions