Skip to content

Optimise load - TCO #331

@wouterpeere

Description

@wouterpeere

There already was quite a difference between an optimisation for power and for energy w.r.t. the geothermal share in your hybrid system. However, when optimising with energy, this led to typically very big installations.

This new method has the goal of doing the optimisation for energy but with economics in mind, so instead of maximising the geothermal share, we will install the system that will give us the most economic result.

This could be done by simply iterating over the optimise energy method, but this would be rather slow. Therefore, a new methodology will be developed in this issue.

Metadata

Metadata

Assignees

Labels

enhancementNew feature or request

Projects

Status

No status

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions