The OPI members may contribute some hardware to be co-managed between the member and the lab staff. Having hardware in the OPI lab helps to validate compatibility and to avoid regressions.
The OPI lab should be used for:
Phase 0
-
define partitioning
-
budgeting
-
hardware duplication only when needed and if needed
-
automatic testing
- Phase 1:
- Functional validation and regression
- scheduled functional validation
- patch validation (CI)
- No Access except the lab owner(s) responsible to maintain the CI/CD
- Conformance
- Functional validation and regression
- Phase 2:
- Interoperability
- Reserve IPU/DPUs from multiple vendors to run the test
- Test portability, compatibility
- Interoperability
- Phase 1:
-
manual
-
Phase 3:
-
Drive adoption
- Open Access All IPU/DPUs accessible to all OPI members
- Demos, Conferences - OPI Lab preferred
- Learning, Training - Vendor Lab preferred
- Development lab for SW vendors
-
-
Phase 4:
-
certification
-
The performance data generated in the lab shall not be used for competitive marketing purposes. Conformance data or certifications from OPI labs can be used for marketing purposes.
In order to serve the OPI community, these properties should be targeted:
- reliability: always running, without false positive result
- neutrality: same automatic tests and configurations on all HW/SW platforms
- security: access is restricted to avoid unexpected changes
- 2 years minimum engagement
- 1 year billing intervals
- ease to replicate the testbed
- ease of use
- separation (physical or by time bound reservation) of HW/SW used for automated regression from manual
- clean start before each reservation (restore to factory defaults functionality)
- restricted access to the automated setup (only maintainers get access)
- reservation based access to the manual setup
- All critical servers must be backed up.
- Restoration of critical servers must be done within a couple of hours.
- Hosting provider must be trained to do backup/restore.
- Wait queue for automatic tests should be less than 1 hour.
- Sufficient excess capacity so that manual workloads does not affect automatic tests too much.
- System must support firmware updates.
- End users given 2 weeks notice for major lab works
- End users given 1 week notice for regular lab maintenance works
- End users notified as soon as it is known immediate emergency lab work need to be done
- Hosting provider must be notified 2 days in advance of a change on a machine in order to avoid false negative results due to an upgrade in process.
- Any environment change (firmware, OS update or new software) and test changes (new or updated use case) must be validated first before being used in automatic tests.
- Lab inventory management system in place
- Lab tech updates inventory as needed
- Lab manager assigned
- Process in place to forecast equipment needs
- Questionnaire in place to be handed out to lab users to help with equipment forecast
- Lab requirements reviewed by OPI TSC
- Sufficient budget in place to fund initial capital costs
- Sufficient budget in place to fund ongoing operations
- Ticketing system in place to request lab services
- Wiki showing servers, assigned owners, emergency console and SSH access info
- Documentation in place for browsing, requesting, and releasing lab resources
- e.g. how to request for new physical servers with power cycler
- Documentation in place for lab resources and interconnection
- SSH access at 99% availability.
- Automatic tests running at 95% availability (includes maintenance downtime).