You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
In a "design view", after a design is decommissioned, a changeset allows to see the design revisions / history and shows valid number of records.
Observed Behavior
In a "design view", after a design is decommissioned, a changeset view indicates a number of objects before a design was decommissioned.
Ie. If there were 15 objects before decommission, after decommission "change records" indicate 15 (instead of 0).
Also, if design is decommission, I would like to know what were the past values.
Steps to Reproduce
Create design
Decommission a design
Navigate to design instance and check design objects panel
The text was updated successfully, but these errors were encountered:
Environment
Expected Behavior
In a "design view", after a design is decommissioned, a changeset allows to see the design revisions / history and shows valid number of records.
Observed Behavior
In a "design view", after a design is decommissioned, a changeset view indicates a number of objects before a design was decommissioned.
Ie. If there were 15 objects before decommission, after decommission "change records" indicate 15 (instead of 0).
Also, if design is decommission, I would like to know what were the past values.
Steps to Reproduce
The text was updated successfully, but these errors were encountered: