Skip to content

Begin docs site

Begin docs site #37

Triggered via push January 18, 2026 17:08
Status Failure
Total duration 45s
Artifacts

run-tests.yml

on: push
Matrix: Build and test pHroc
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Build and test pHroc (3.12)
Process completed with exit code 1.
Build and test pHroc (3.10)
The strategy configuration was canceled because "build._3_12" failed
Build and test pHroc (3.10)
The operation was canceled.
Build and test pHroc (3.11)
The strategy configuration was canceled because "build._3_12" failed
Build and test pHroc (3.11)
The operation was canceled.