| title | Launch sequencing |
|---|---|
| status | prepared |
| audience | operator |
| linear | LS-1690 |
| last_checked | 2026-06-14 |
This is the PR-21 / LS-1690 sequencing plan. It orders the public launch channels, ties each post to the approved LS-1689 drafts, and names the evidence to record.
Do not post externally without operator approval.
- PR-10 repository visibility is public.
- PR-12
v0.1.0release exists. - PR-20 launch drafts are staged in
docs/launch/launch-narrative-drafts.md. - PR-19 response SLO is active in
docs/launch/launch-week-response-slo.md. - Any channel-specific copy edits are approved before posting.
| Order | Channel | Draft source | Timing | Evidence to record |
|---|---|---|---|---|
| 1 | Show HN | docs/launch/launch-narrative-drafts.md |
Day 0, first public post | HN item URL, first reply timestamp, notable questions |
| 2 | X / Bluesky | same | Day 0 after HN | thread URL(s), first reply timestamp |
| 3 | r/selfhosted | same | Day 1 | Reddit URL, moderation status, first reply timestamp |
| 4 | r/ObsidianMD | same | Day 1 or after companion submission opens | Reddit URL, moderation status, companion questions |
| 5 | r/LocalLLaMA | same | Day 2 | Reddit URL, moderation status, benchmark questions |
| 6 | MCP community Discord | same | Day 2 or after registry submission opens | message link if available, server/channel, first reply timestamp |
| 7 | Directory updates | docs/launch/directory-submission-prep.md |
As reviews progress | registry/listing/submission URLs |
For each posted channel:
- Add the post URL to LS-1689 and LS-1690.
- Run the LS-1688 queue check after posting and again within 24 hours.
- Answer correction-worthy questions with source links, not speculation.
- If a draft claim is challenged and evidence is weaker than expected, update the launch draft or docs before reusing the claim elsewhere.
- Keep benchmark answers within the published comparability envelope.
Pause the sequence if any of these happen:
- a security report arrives;
- a preflight/public-surface issue is found;
- a benchmark claim is shown to be misleading;
- a setup path fails for a real external user and cannot be answered from docs;
- the response SLO has an unresponded external first-contact item near 24 hours.
LS-1690 can move to Done only after:
- all approved channels are posted in the recorded sequence;
- LS-1688 response checks cover the active launch window;
- a retro note is written under
docs/reports/; - the full gate set passes for the retro PR.