Sprint: S5 (2026-08-10 to 2026-08-16) · Build: B9 · Priority: P0 · Route: —
All 106 routes reachable and functional for the appropriate role. Notification send → receive verified. Feature freeze at EOD — from this point only bug fixes, performance, and accessibility work are allowed.
Imported from the sprint tracker (2026-07-20).
Sprint: S5 (2026-08-10 to 2026-08-16) · Build: B9 · Priority: P0 · Route:
—All 106 routes reachable and functional for the appropriate role. Notification send → receive verified. Feature freeze at EOD — from this point only bug fixes, performance, and accessibility work are allowed.
Imported from the sprint tracker (2026-07-20).