Skip to content

Bump cmd-shim from 8.0.0 to 9.0.1 #5324

Bump cmd-shim from 8.0.0 to 9.0.1

Bump cmd-shim from 8.0.0 to 9.0.1 #5324

Triggered via push July 6, 2026 16:31
Status Failure
Total duration 40m 20s
Artifacts

tests.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Node 25 / Linux
Process completed with exit code 1.
Node 24 / Linux
Process completed with exit code 1.
Node 20 / Linux
The job has exceeded the maximum execution time of 40m0s
Node 20 / Linux
The operation was canceled.
Node 22 / Linux
The job has exceeded the maximum execution time of 40m0s
Node 22 / Linux
The operation was canceled.
Node 18 / Linux
The job has exceeded the maximum execution time of 40m0s
Node 18 / Linux
The operation was canceled.