chore(deps): bump golang.org/x/net from 0.32.0 to 0.38.0 in /test #28
build-and-test.yml
on: pull_request
build
19s
Matrix: test-arm64
Matrix: test
Annotations
10 errors
|
Test upgrade 14 to 16 (multi-step)
Process completed with exit code 125.
|
|
Test upgrade 14 to 15
Process completed with exit code 125.
|
|
Test upgrade 15 to 17 (multi-step)
Process completed with exit code 125.
|
|
Test upgrade 15 to 17 (multi-step)
The strategy configuration was canceled because "test._14_16_14_to_16__multi-st" failed
|
|
Test upgrade 15 to 16
Process completed with exit code 125.
|
|
Test upgrade 15 to 16
The strategy configuration was canceled because "test._14_16_14_to_16__multi-st" failed
|
|
Test upgrade 14 to 17 (full upgrade)
The operation was canceled.
|
|
Test upgrade 14 to 17 (full upgrade)
The strategy configuration was canceled because "test._14_16_14_to_16__multi-st" failed
|
|
Test upgrade 16 to 17
The operation was canceled.
|
|
Test upgrade 16 to 17
The strategy configuration was canceled because "test._14_16_14_to_16__multi-st" failed
|