Skip to content

chore(deps): bump golang.org/x/net from 0.32.0 to 0.38.0 in /test #28

chore(deps): bump golang.org/x/net from 0.32.0 to 0.38.0 in /test

chore(deps): bump golang.org/x/net from 0.32.0 to 0.38.0 in /test #28

Triggered via pull request August 29, 2025 12:07
Status Failure
Total duration 53s
Artifacts

build-and-test.yml

on: pull_request
Matrix: test-arm64
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Test upgrade 14 to 16 (multi-step)
Process completed with exit code 125.
Test upgrade 14 to 15
Process completed with exit code 125.
Test upgrade 15 to 17 (multi-step)
Process completed with exit code 125.
Test upgrade 15 to 17 (multi-step)
The strategy configuration was canceled because "test._14_16_14_to_16__multi-st" failed
Test upgrade 15 to 16
Process completed with exit code 125.
Test upgrade 15 to 16
The strategy configuration was canceled because "test._14_16_14_to_16__multi-st" failed
Test upgrade 14 to 17 (full upgrade)
The operation was canceled.
Test upgrade 14 to 17 (full upgrade)
The strategy configuration was canceled because "test._14_16_14_to_16__multi-st" failed
Test upgrade 16 to 17
The operation was canceled.
Test upgrade 16 to 17
The strategy configuration was canceled because "test._14_16_14_to_16__multi-st" failed