Skip to content

wip

wip #13

Triggered via push August 28, 2025 18:34
Status Failure
Total duration 24s
Artifacts

test.yml

on: push
test-complete-suite
15s
test-complete-suite
Matrix: test-builds
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test-builds (16)
Process completed with exit code 2.
test-complete-suite
Process completed with exit code 2.
test-builds (17)
The operation was canceled.
test-builds (17)
The strategy configuration was canceled because "test-builds._16" failed
test-builds (15)
The operation was canceled.
test-builds (15)
The strategy configuration was canceled because "test-builds._16" failed