In the complementary PDF file (describing the schedule structure) we should add how DISCOS handles the combination of two scans/subscan parameters. The parameters are the backend procedure (BCKProcedure) and the subscan length(BCKProcedure).
- BCKProcedure Duration
- NULL <=0 msec Bck not configured, No recording, only pre e post procedures are run one after the other
- NULL >0 msec Bck not configured , No recording, the scan takes duration msec, pre and post are run
- Proc <=0 msec Bck is configured, No recording, pre e post procedures are run one after the other
- Proc >0 msec Bck is configured, Data recording, the scan takes duration msec, pre and post are run