[CEP] Environment-specific branching configuration (eg staging.yml) #27990
Comments
Can you elaborate on how this would work. Won't you still need access to push the updated branch to Github before deploy? |
Does this mean I think our staging deployment model is sufficiently complicated that it is not ideal for production environments. There are a lot of things that can go wrong. As you point out, conflicts and untested code combinations are an issue. It is not usually a big deal if staging goes down for a short time or has buggy areas (as long as those areas are not being tested). |
Doh, that was an oversight. I suppose part of the branching config could be to define a remote repo to use for the deploy - that would make a lot of sense, actually. I think I'll consider that out of scope for this change though and focus on the Dimagi internal use-cases.
Sort of. It should be safe to assume that you can just run deploy like normal, but if the last deploy were a hotfix, you wouldn't be able to deploy unless you either updated the hotfix branch (likely via
I agree it would be dangerous to do more frequent unorthodox deploys, especially if cherry-picking commits is involved. However we already do this on occasion in an ad-hoc fashion, and it seems safer to be rigorous about it when it is necessary. Would you agree with that? What do you think would be the safest way to manage code freezes and hot fixes? |
Do I have this right? In normal flow the production If that is all correct then it seems reasonable given that it only imposes extra steps around the hotfix workflow, and that seems like a good thing. Except for hotfixes (where it happens anyway), I'm still ambivalent toward using a |
@millerdev yup, that's all correct.
Totally agree. My intent (I'll see if I can clarify wording in the original post) is that the "normal flow" case means that we just deploy |
+1 |
@esoergel currently the tool is executed in the checked out repo that is the source for the branch. Moving this to commcare-cloud would mean the script would need to either checkout the repo first or else be given a local path to the repo. Do you have a sense of which of those 2 would be better? |
@snopoke I was imagining the latter. I wrote in the spec that the local path could be provided via an environment variable, but I'd be open to alternate approaches. Making a new clone of the repo does have some appeal though - it'd be nice to avoid messing with a local development copy. I think HQ is too big to clone fresh each time, but I could see a case made for this tool to store a local copy for its own internal use. What do you think? |
+1 to supplying the path to the repos - I think if you want to use separate clones for this you can always check out a copy yourself. For small repos it might be nice to have the tool clone it but for HQ I don't think it makes sense. I'm likely to start doing some work related to this since ICDS is soon going to have 2 repos to manage so it makes sense to move this tool of the HQ repo. For now I'm likely just going to put it into commcare-cloud. |
Awesome, that'll be exciting to see.
Very good point |
initial work: dimagi/commcare-cloud#4050 |
Created external tool to build the branches: https://github.com/dimagi/git-branch-builder |
migrated HQ scripts to use external tool: #28473 |
Abstract
While most environments usually run
master
, thestaging
environment runs a composite branch defined by staging.yml. This CEP proposes to extend that model for all environments. Each environment will have its ownbranches.yml
file which will define what code should be deployed.Motivation
Production environments usually just deploy whatever the latest master commit is. There are some notable exceptions to this rule:
Communicating these exceptions is informal, and coordination is tricky - we've spun up docs in the past detailing what should be deployed like
commit abc123 plus PR 456 plus PR 458
. The aim of this CEP is to formalize that process and make use of existing tooling in managing this.Specification
rebuildstaging
a standalone tool (name TBD, something likecombine-branches
?)a. Have this tool accept an environment-specific config file and operate on a repository specified in an environment variable.
staging.yml
to the staging environment config directory and renamebranches.yml
rebuildstaging
to not build anything ifname
ismaster
a. This should fall back to
master
if the env doesn't have abranches.yml
a.
_confirm_deploying_same_code()
should be updated to reflect these changes.After the above changes, the state of the world would look like:
staging.yml
in a different location and a slightly different command to rebuild.Access to staging configurations can be granted by environment-specific repositories. For example, ICDS staging could be maintained apart from commcare-hq and commcare-cloud, meaning contractors could be granted access without obtaining write access to the HQ repository.[this would require specifying an alternate remote repository as well]trunk
andname
tomaster
, and the rest of the file blank. This would result in a normal deploy of the latest master.trunk
would be set to the last full deploy commit,name
would be a hotfix branch name, and code to be included would be referenced as additional branches.combine-branches
(or whatever) will rebuild the hotfix branch by adding the specified changes on top of the last deploy commit.master
, it will have to be manually updated to pick up changes, but the deploy script will warn you if you forget.Impact on users
n/a
Impact on hosting
Backwards compatibility
👍
Release Timeline
Open questions and issues
As frequently evidenced on staging, dynamically combining branches can introduce conflicts, including some that aren't identified by git. Should we be concerned about an increased reliance on this model? As envisioned, tests won't be run on the resulting branch before it's deployed. How can we minimize the risks associated with this? Would mandating that branches be merged in to master before being added to a
branches.yml
help?The text was updated successfully, but these errors were encountered: