Synchronize downstream test then deploy #609
Triggered via pull request
September 7, 2023 23:47
Status
Cancelled
Total duration
1m 51s
Artifacts
–
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
test.yml
on: pull_request
Build test env
1m 14s
Matrix: Run Integration Tests
Push Release candidate package to allow devs to use to test
0s
Matrix: run-downstream-test-workflows
Matrix: trigger-pkg-upgrade
Annotations
6 errors
Run Integration Tests (Basic tests #1, npm run test:ci -- --shard 1/2)
The run was canceled by @yiwork.
|
Run Integration Tests (Basic tests #1, npm run test:ci -- --shard 1/2)
A task was canceled.
|
Run Integration Tests (Basic tests #2, npm run test:ci -- --shard 2/2)
The run was canceled by @yiwork.
|
Run Integration Tests (Basic tests #2, npm run test:ci -- --shard 2/2)
A task was canceled.
|
Type Check
The run was canceled by @yiwork.
|
Type Check
The operation was canceled.
|