Skip to content

Build: Bump bodo from 2025.10.2 to 2025.11.2 #7128

Build: Bump bodo from 2025.10.2 to 2025.11.2

Build: Bump bodo from 2025.10.2 to 2025.11.2 #7128

Triggered via pull request December 8, 2025 22:31
Status Failure
Total duration 10m 30s
Artifacts

python-ci.yml

on: pull_request
Matrix: integration-test
Matrix: lint-and-test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
integration-test (3.10)
Process completed with exit code 2.
integration-test (3.12)
The strategy configuration was canceled because "integration-test._3_10" failed
integration-test (3.12)
The operation was canceled.
integration-test (3.11)
The strategy configuration was canceled because "integration-test._3_10" failed
integration-test (3.11)
The operation was canceled.