dep: disallow pydantic 2.12.0 and 2.12.1, update poetry lock to use p… #6730
python-ci.yml
on: push
Matrix: integration-test
Matrix: lint-and-test
Annotations
7 errors
|
integration-test (3.11)
Process completed with exit code 2.
|
|
integration-test (3.10)
The strategy configuration was canceled because "integration-test._3_11" failed
|
|
integration-test (3.10)
The operation was canceled.
|
|
integration-test (3.9)
The strategy configuration was canceled because "integration-test._3_11" failed
|
|
integration-test (3.9)
The operation was canceled.
|
|
integration-test (3.12)
The strategy configuration was canceled because "integration-test._3_11" failed
|
|
integration-test (3.12)
The operation was canceled.
|