You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Already checked with EDDS TWR mentoring team. Closure will be implemented, but controllers may decide to disregard it during events and CPTs when necessary.
If possible, could the construction on taxiway Z and W be placed below the holding lines and the taxiline during the implementation of the construction? Also during de-icing operations, taxiway S is highlighted in light yellow on all used pads below the taxiline (e.g. DP1 & DP2 are used, Taxiway S is in light-yellow between Taxiway I and H). Source: https://youtu.be/CGUxbQ1xeMs?si=3_PJykb2QpW1FAl8&t=177
during de-icing operations, taxiway S is highlighted in light yellow on all used pads below the taxiline
Leider aktuell nicht automatisch möglich aufgrund von Pluginlimitationen - Featurerequest, die das möglich machen würde ist aber schon raus, also fingers crossed
Construction work at EDDS, 01.04.2025-30.09.2025, cf. AIP IFR SUP 04/25
Branch: https://github.com/VATGER-Nav/edgg-package/tree/2503-AIP_IFR_SUP_04/25
Stands 16 thru 18 closed (@capzDE)
TWY M between stands 19 and 47 and TWY L2 max. wingspan reduced to code C (@sergej-singer)
All maps temporary to be only shown during construction time frame.
ATC briefing (@capzDE)
The text was updated successfully, but these errors were encountered: