Requirement Traceability Mapping

To ensure high-quality engineering and evaluation readiness, all contract changes must be mapped to their respective acceptance criteria. This documentation defines the standard traceability table format required for all Pull Requests (PRs).

The Completion Table is the canonical acceptance criteria audit template used for every PR.

Completion Table Format

Every PR must include a completion table in its description mapping each acceptance criterion to its status and evidence. This table helps contributors self-evaluate before payment day and makes review expectations clear.

Table Structure

Acceptance Criterion Status Implementation Evidence Test Evidence Documentation Impact
AC 1: Brief description Complete fn name() — link to line or brief description test_name — file:line docs/page.md updated
AC 2: ... Partial Reason and what was done Tests that exist Follow-up docs needed
AC 3: ... Not Met Explanation N/A N/A — no behavior changed

Status Definitions

Status Meaning
Complete The criterion is fully satisfied — implementation and tests are in place.
Partial The criterion is partially addressed but has known gaps (must explain why in the evidence column).
Not Met The criterion is not addressed in this PR (must explain why in the evidence column).

Documentation Impact Evidence

For every criterion, use the Documentation Impact column to identify the README, contributor guide, API reference, specification, or other document that changed. Write N/A with a short reason when the criterion has no documentation impact. Do not leave the column blank: an explicit N/A tells reviewers that documentation impact was assessed rather than overlooked.

Handling Incomplete Criteria

If any acceptance criterion is marked Partial or Not Met:

  1. Explain why in the Implementation Evidence column (e.g., "scope limited — criterion deferred to follow-up PR", "blocked by upstream dependency", "out of scope for this issue").
  2. Link to a follow-up issue if the criterion is intentionally deferred.
  3. Record documentation impact for the work that is complete and note any deferred documentation in the Documentation Impact column.
  4. Do not request payment evaluation for incomplete criteria — payment is assessed against full acceptance criteria coverage.
  5. Reviewers may reject a PR with incomplete criteria unless a clear, accepted rationale is provided and the incomplete items are explicitly scoped out.

If you cannot mark all criteria Complete, be honest about it. Incomplete criteria with clear explanations and follow-up plans are accepted more readily than claims of completeness that don't hold up under review.


Detailed Traceability Table Format (Advanced)

For complex PRs involving storage changes, events, or security controls, include the detailed traceability table below instead of (or in addition to) the completion table.

Table Structure

Acceptance Criteria Implementation (Functions/Logic) Storage & State Changes Events Emitted Test Coverage (File:Line) Security/Safety Controls
AC 1: Brief description fn name() DataKey::X (Instance/Persistent) EventName test_name require_auth, require_not_paused
AC 2: ... ... ... ... ... ...

Mapping Definitions

  1. Acceptance Criteria: The specific requirement being addressed, as defined in the issue.
  2. Implementation: The specific function(s) or logic blocks that implement the requirement.
  3. Storage & State Changes: Any new or modified DataKey entries, specifying if they use Instance, Persistent, or Temporary storage.
  4. Events Emitted: The contracttype events published upon successful execution.
  5. Test Coverage: The specific unit test name and location (file and approximate line range) verifying the logic.
  6. Security/Safety Controls: Authorization checks (require_auth), pause checks (require_not_paused), or role-based access control (require_role) applied to the logic.

Example Mapping

Scenario: Implementing a new supply cap amendment flow.

Acceptance Criteria Implementation Storage & State Changes Events Emitted Test Coverage Security/Safety Controls
AC 1: Only admin can propose cap propose_supply_cap DataKey::SupplyCapCandidate (Instance) SupplyCapProposedEvent test.rs:L145-160 require_auth, get_admin check
AC 2: Cap must be non-negative propose_supply_cap N/A (Validation) N/A test.rs:L162-170 assert!(proposed_cap >= 0)
AC 3: Amendments are 2-step accept_supply_cap DataKey::SupplyCap (Instance) SupplyCapAmendedEvent test.rs:L175-195 require_not_paused, require_auth

Why This Matters

  • Audit Readiness: Provides a clear roadmap for security auditors to verify that every requirement has a corresponding implementation and test.
  • Review Efficiency: Helps maintainers quickly locate the relevant logic and tests during the PR review process.
  • Protocol Stability: Ensures no edge cases or security controls are missed during implementation.
  • Payment Readiness: Enables contributors to self-evaluate before payment day — a complete table with all criteria marked Complete gives reviewers confidence to approve payment.