Skip to content

Latest commit

Β 

History

History
707 lines (529 loc) Β· 18.1 KB

File metadata and controls

707 lines (529 loc) Β· 18.1 KB

ArenaX Development Issues Backlog

Overview

This document contains a comprehensive breakdown of all features and components that need to be implemented to rebuild the ArenaX gaming platform. Issues are organized by priority and categorized by component to minimize dependencies and enable parallel development.

Issue Categories & Labels

Priority Labels

  • πŸ”₯ Critical: Core functionality, blocking features
  • ⚑ High: Important features, user-facing functionality
  • πŸ“‹ Medium: Nice-to-have features, quality improvements
  • πŸ› Low: Minor improvements, optimizations

Component Labels

  • πŸ—οΈ backend: Backend API and services
  • 🎨 frontend: Frontend user interface
  • πŸ“„ contracts: Smart contracts
  • πŸ—ƒοΈ database: Database schema and migrations
  • πŸ” auth: Authentication and authorization
  • 🎯 tournaments: Tournament management
  • βš”οΈ matches: Match system and matchmaking
  • 🌐 realtime: WebSocket and real-time features
  • πŸ“± mobile: Mobile responsiveness
  • πŸ§ͺ testing: Testing infrastructure
  • πŸš€ devops: CI/CD and deployment
  • πŸ“š docs: Documentation

πŸ”₯ Critical Priority Issues

Backend Infrastructure

Issue #1: Backend Project Setup & Dependencies

Labels: πŸ—οΈ backend, πŸ”₯ critical

Description: Initialize the Rust backend project with proper dependencies and configuration.

Requirements:

  • Set up Cargo.toml with all required dependencies (Actix Web, SQLx, Redis, JWT, etc.)
  • Configure environment variables and config management
  • Set up basic project structure (src/, tests/, migrations/)
  • Implement health check endpoint
  • Add basic error handling and logging

Acceptance Criteria:

  • Project compiles successfully
  • Health check endpoint returns 200 OK
  • Environment configuration loads properly
  • Basic logging is functional

Dependencies: None Estimated Effort: 1-2 days

Issue #2: Database Schema & Migrations

Labels: πŸ—ƒοΈ database, πŸ”₯ critical

Description: Design and implement the complete database schema for the gaming platform.

Requirements:

  • User accounts and profiles
  • Tournament management (tournaments, participants, brackets)
  • Match system (matches, scores, disputes)
  • Device management and security policies
  • Audit logs and telemetry
  • Stellar blockchain integration tables

Tables Required:

  • users, user_profiles, user_devices
  • tournaments, tournament_participants, tournament_brackets
  • matches, match_participants, match_scores, match_disputes
  • leaderboard, elo_ratings
  • stellar_accounts, stellar_transactions
  • audit_logs, notifications

Acceptance Criteria:

  • All migrations created and tested
  • Schema documentation complete
  • Relationships properly defined
  • Indexes optimized for query performance

Dependencies: #1 Estimated Effort: 3-4 days

Issue #3: Authentication & JWT Service

Labels: πŸ” auth, πŸ”₯ critical

Description: Implement comprehensive authentication system with JWT tokens.

Requirements:

  • User registration and login
  • JWT token generation and validation
  • Password hashing with bcrypt
  • Device-based authentication
  • Token refresh mechanism
  • Logout and token blacklisting
  • Rate limiting for auth endpoints

Acceptance Criteria:

  • Users can register and login
  • JWT tokens are properly signed and validated
  • Passwords are securely hashed
  • Device tracking works correctly
  • Token refresh flow functions

Dependencies: #1, #2 Estimated Effort: 2-3 days

Smart Contracts Foundation

Issue #4: Example Contract Setup

Labels: πŸ“„ contracts, πŸ”₯ critical

Description: Set up the Soroban smart contract development environment with a working example contract.

Requirements:

  • Soroban SDK installation and configuration
  • Example contract with basic functionality
  • Contract testing framework
  • Deployment scripts for Stellar testnet
  • Event emission and state management
  • Proper error handling and validation

Example Contract Features:

  • Contract initialization
  • Persistent storage operations
  • Event logging
  • Access control (admin functions)
  • Counter functionality for demonstration

Acceptance Criteria:

  • Example contract compiles successfully
  • Contract deploys to Stellar testnet
  • All functions work as expected
  • Unit tests pass with good coverage
  • Development workflow is established

Dependencies: None Estimated Effort: 2-3 days

Frontend Foundation

Issue #6: Frontend Project Setup

Labels: 🎨 frontend, πŸ”₯ critical

Description: Initialize Next.js frontend with proper tooling and basic structure.

Requirements:

  • Next.js 14+ with TypeScript
  • Tailwind CSS for styling
  • ESLint and Prettier configuration
  • Basic component library setup
  • API client configuration
  • Environment variable setup

Acceptance Criteria:

  • Project builds successfully
  • Basic routing works
  • Styling system is configured
  • Linting passes
  • Development server starts without errors

Dependencies: None Estimated Effort: 1-2 days

Issue #7: Authentication UI Components

Labels: 🎨 frontend, πŸ” auth, πŸ”₯ critical

Description: Create authentication UI components and flows.

Requirements:

  • Login page with form validation
  • Registration page with password confirmation
  • Protected route components
  • Authentication state management
  • User profile components

Acceptance Criteria:

  • Users can register new accounts
  • Login flow works correctly
  • Authentication state persists
  • Protected routes redirect properly

Dependencies: #6 Estimated Effort: 2-3 days


⚑ High Priority Issues

Tournament System

Issue #8: Tournament Creation & Management API

Labels: πŸ—οΈ backend, 🎯 tournaments, ⚑ high

Description: Implement comprehensive tournament management API endpoints.

Requirements:

  • Create tournament endpoint with validation
  • Update tournament status and settings
  • Get tournament details and participants
  • Tournament search and filtering
  • Bracket generation algorithms

API Endpoints:

  • POST /api/tournaments
  • GET /api/tournaments
  • GET /api/tournaments/{id}
  • PUT /api/tournaments/{id}
  • DELETE /api/tournaments/{id}

Acceptance Criteria:

  • All CRUD operations work
  • Validation prevents invalid tournaments
  • Search and filtering work efficiently
  • Proper error responses for all edge cases

Dependencies: #1, #2, #3 Estimated Effort: 3-4 days

Issue #9: Tournament UI Components

Labels: 🎨 frontend, 🎯 tournaments, ⚑ high

Description: Build comprehensive tournament UI components and pages.

Requirements:

  • Tournament creation form
  • Tournament listing page with filters
  • Tournament detail page
  • Tournament bracket visualization
  • Participant management interface

Components Needed:

  • TournamentCard, TournamentList
  • TournamentForm, TournamentDetails
  • BracketVisualizer, ParticipantTable

Acceptance Criteria:

  • Tournament creation flow is intuitive
  • Tournament browsing is smooth
  • Bracket visualization is clear
  • Mobile responsive design

Dependencies: #6, #7 Estimated Effort: 4-5 days

Match System

Issue #10: Matchmaking & Match API

Labels: πŸ—οΈ backend, βš”οΈ matches, ⚑ high

Description: Implement the core matchmaking and match management system.

Requirements:

  • Matchmaking queue management
  • Match creation and assignment
  • Score reporting and validation
  • ELO rating calculations
  • Match dispute system

Acceptance Criteria:

  • Players can join matchmaking queue
  • Matches are created efficiently
  • Scores are reported and validated
  • ELO ratings update correctly
  • Disputes can be filed and resolved

Dependencies: #1, #2, #3 Estimated Effort: 4-5 days

Issue #11: Leaderboard System

Labels: πŸ—οΈ backend, βš”οΈ matches, ⚑ high

Description: Implement comprehensive leaderboard and ranking system.

Requirements:

  • Global and game-specific leaderboards
  • ELO-based rankings
  • Tournament-specific leaderboards
  • Real-time leaderboard updates

Acceptance Criteria:

  • Leaderboards update in real-time
  • Rankings are accurate and fair
  • Performance is optimized for scale

Dependencies: #10 Estimated Effort: 2-3 days

Real-time Features

Issue #12: WebSocket Infrastructure

Labels: πŸ—οΈ backend, 🌐 realtime, ⚑ high

Description: Implement WebSocket server for real-time communication.

Requirements:

  • WebSocket server setup
  • Connection management and authentication
  • Room/channel system for tournaments
  • Message broadcasting and routing
  • Connection pooling and scaling

Acceptance Criteria:

  • WebSocket connections are stable
  • Authentication works properly
  • Message delivery is reliable
  • Server scales horizontally

Dependencies: #1, #3 Estimated Effort: 3-4 days

Issue #13: Real-time Frontend Integration

Labels: 🎨 frontend, 🌐 realtime, ⚑ high

Description: Integrate WebSocket client for real-time updates in the frontend.

Requirements:

  • WebSocket client library integration
  • Connection state management
  • Automatic reconnection
  • Message handling and routing

Acceptance Criteria:

  • Real-time updates work without page refresh
  • Connection is stable and reconnects automatically
  • UI updates smoothly

Dependencies: #6, #12 Estimated Effort: 2-3 days


πŸ“‹ Medium Priority Issues

Advanced Tournament Features

Issue #14: Tournament Bracket Algorithms

Labels: πŸ—οΈ backend, 🎯 tournaments, πŸ“‹ medium

Description: Implement advanced tournament bracket generation and management.

Requirements:

  • Single elimination brackets
  • Double elimination brackets
  • Round-robin tournaments
  • Bracket visualization data
  • Bye handling for uneven participants

Acceptance Criteria:

  • All tournament types work correctly
  • Brackets generate properly
  • Edge cases are handled (byes, etc.)

Dependencies: #8 Estimated Effort: 3-4 days

Issue #15: Tournament Analytics & Insights

Labels: πŸ—οΈ backend, 🎯 tournaments, πŸ“‹ medium

Description: Add analytics and insights for tournament performance.

Requirements:

  • Tournament participation statistics
  • Win/loss ratios by game type
  • Prize pool distribution analytics
  • Tournament completion rates

Acceptance Criteria:

  • Analytics data is accurate
  • Dashboard is informative
  • Performance metrics are useful

Dependencies: #8, #11 Estimated Effort: 2-3 days

Smart Contract Extensions

Issue #16: Token Contract Implementation

Labels: πŸ“„ contracts, πŸ“‹ medium

Description: Implement ERC-20 compatible token contract for the platform economy.

Requirements:

  • Standard token functionality (transfer, approve, allowance)
  • Minting and burning capabilities
  • Admin controls for token management
  • Event emission for all operations

Acceptance Criteria:

  • Token deploys successfully on testnet
  • All ERC-20 functions work correctly
  • Admin controls function properly
  • Events are emitted for transparency

Dependencies: #4 Estimated Effort: 3-4 days

Issue #17: Tournament Escrow Contract

Labels: πŸ“„ contracts, 🎯 tournaments, πŸ“‹ medium

Description: Implement secure escrow system for tournament prize pools and entry fees.

Requirements:

  • Tournament stake collection and holding
  • Automated prize distribution to winners
  • Refund mechanisms for cancelled tournaments
  • Platform fee collection

Acceptance Criteria:

  • Funds are held securely during tournaments
  • Winners receive prizes automatically
  • Refunds work for cancellations
  • All transactions are auditable

Dependencies: #4 Estimated Effort: 4-5 days

Device Management

Issue #18: Device Security & Management API

Labels: πŸ—οΈ backend, πŸ” auth, πŸ“‹ medium

Description: Implement comprehensive device management and security features.

Requirements:

  • Device registration and tracking
  • Security policy enforcement
  • Suspicious activity detection
  • Device blacklisting

Acceptance Criteria:

  • Devices are properly tracked
  • Security policies are enforced
  • Suspicious activity is flagged

Dependencies: #3 Estimated Effort: 2-3 days

Issue #19: Device Management UI

Labels: 🎨 frontend, πŸ” auth, πŸ“‹ medium

Description: Create device management interface for users.

Requirements:

  • Device listing and details
  • Device naming and categorization
  • Security status indicators

Acceptance Criteria:

  • Users can view all their devices
  • Device management is intuitive

Dependencies: #7, #18 Estimated Effort: 2-3 days

Advanced Match Features

Issue #20: Match Replay & Analysis System

Labels: πŸ—οΈ backend, βš”οΈ matches, πŸ“‹ medium

Description: Implement match replay storage and analysis capabilities.

Requirements:

  • Match data recording
  • Replay storage and retrieval
  • Match analysis tools

Acceptance Criteria:

  • Match data is recorded accurately
  • Replays can be retrieved and viewed
  • Analysis tools work correctly

Dependencies: #10 Estimated Effort: 3-4 days

Issue #21: Anti-Cheat Integration

Labels: πŸ—οΈ backend, βš”οΈ matches, πŸ“‹ medium

Description: Integrate anti-cheat measures and suspicious activity detection.

Requirements:

  • Statistical anomaly detection
  • Pattern recognition for cheating
  • Automated reporting system

Acceptance Criteria:

  • Cheating attempts are detected
  • False positives are minimized

Dependencies: #10 Estimated Effort: 4-5 days


πŸ› Low Priority Issues

Quality of Life Improvements

Issue #22: Email Notification System

Labels: πŸ—οΈ backend, πŸ“‹ medium

Description: Implement email notifications for important events.

Requirements:

  • Tournament invitations and reminders
  • Match notifications
  • Security alerts

Acceptance Criteria:

  • Emails are delivered reliably
  • Templates are professional
  • User preferences are respected

Dependencies: #3 Estimated Effort: 2-3 days

Issue #23: API Documentation & SDK

Labels: πŸ“š docs, πŸ—οΈ backend, πŸ› low

Description: Create comprehensive API documentation and client SDKs.

Requirements:

  • OpenAPI/Swagger documentation
  • Client SDKs (JavaScript, Python, Go)
  • API usage examples

Acceptance Criteria:

  • API is fully documented
  • SDKs work correctly
  • Examples are comprehensive

Dependencies: All backend APIs Estimated Effort: 3-4 days

Mobile & PWA Features

Issue #24: Progressive Web App (PWA)

Labels: 🎨 frontend, πŸ“± mobile, πŸ› low

Description: Enhance the frontend as a Progressive Web App.

Requirements:

  • Service worker implementation
  • Offline functionality
  • App manifest
  • Push notifications

Acceptance Criteria:

  • App installs on mobile devices
  • Offline functionality works
  • Push notifications arrive

Dependencies: #6 Estimated Effort: 2-3 days

Issue #25: Mobile Responsiveness

Labels: 🎨 frontend, πŸ“± mobile, πŸ› low

Description: Ensure full mobile responsiveness across all features.

Requirements:

  • Mobile-first design approach
  • Touch-friendly interactions
  • Optimized layouts for small screens

Acceptance Criteria:

  • All features work on mobile
  • Performance is acceptable
  • User experience is smooth

Dependencies: All frontend components Estimated Effort: 2-3 days

DevOps & Infrastructure

Issue #26: Comprehensive Testing Suite

Labels: πŸ§ͺ testing, πŸš€ devops, πŸ“‹ medium

Description: Implement comprehensive testing infrastructure.

Requirements:

  • Unit tests for all components
  • Integration tests for APIs
  • End-to-end tests for critical flows
  • Contract tests for smart contracts

Acceptance Criteria:

  • Test coverage meets targets
  • CI/CD runs all tests
  • Tests are reliable and fast

Dependencies: All components Estimated Effort: 5-7 days

Issue #27: Production Deployment Pipeline

Labels: πŸš€ devops, πŸ› low

Description: Set up production-ready deployment infrastructure.

Requirements:

  • Docker containerization
  • Kubernetes orchestration
  • CI/CD pipeline for all services

Acceptance Criteria:

  • Zero-downtime deployments
  • Auto-scaling works
  • Security is hardened

Dependencies: All components Estimated Effort: 5-7 days

Issue #28: Application Monitoring & Telemetry

Labels: πŸš€ devops, πŸ“‹ medium

Description: Implement comprehensive monitoring and telemetry.

Requirements:

  • Application performance monitoring
  • Error tracking and alerting
  • User analytics and behavior tracking

Acceptance Criteria:

  • All critical metrics are monitored
  • Alerts trigger appropriately
  • Dashboards provide insights

Dependencies: All components Estimated Effort: 3-4 days


Implementation Roadmap

Phase 1: Foundation (Weeks 1-4)

Focus: Core infrastructure and basic functionality

  • Issues #1-7 (Critical foundation)
  • Total Effort: ~14-20 days

Phase 2: Core Features (Weeks 5-10)

Focus: Tournament and match systems

  • Issues #8-13 (High priority features)
  • Total Effort: ~18-26 days

Phase 3: Advanced Features (Weeks 11-16)

Focus: Extended functionality and smart contracts

  • Issues #14-21 (Medium priority features)
  • Total Effort: ~22-32 days

Phase 4: Polish & Production (Weeks 17-22)

Focus: Quality, testing, and production readiness

  • Issues #22-28 (Low priority and infrastructure)
  • Total Effort: ~22-32 days

Parallel Development Opportunities

  • Backend & Frontend: Can be developed largely independently after API contracts are defined
  • Smart Contracts: Can be developed in parallel with backend work
  • Testing: Should be implemented continuously throughout development
  • DevOps: Should be set up early and refined throughout

Success Metrics

Technical Metrics

  • API Response Time: <200ms for 95% of requests
  • Uptime: 99.9% availability
  • Test Coverage: >90% for critical components
  • Security: Zero critical vulnerabilities in production

Business Metrics

  • User Registration: Target 10,000 active users in first 6 months
  • Tournament Completion: >95% tournament completion rate
  • User Engagement: Average session duration >15 minutes

This document provides a complete roadmap for rebuilding ArenaX with minimal dependencies between issues to enable parallel development.