You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
One of the goals of this project are to be able to produce this speaker in a "standard" fablab, maker space or a small CNC shop. This is because we, with this project, would like to enable local manufactoring. The chosen materials and manufacturing process must therefore be feasible in this setting.
The production process must be described in the projects documentation, basically making it a Production Requirements Document (PRD).
This description are done under the following assumptions:
Small scale production run
Makers are not trained cabinet/wood workers
Most parts will be cut on a CNC aided router table
Non fabricated parts and materials can be source with relative ease
Definition of Done
All needed parts of the speaker and their production can be easily source by small businesses and individuals
Clear and concise assembly description
Documentation
Which part of the documentation needs to be updated or extended?
The text was updated successfully, but these errors were encountered:
Description
One of the goals of this project are to be able to produce this speaker in a "standard" fablab, maker space or a small CNC shop. This is because we, with this project, would like to enable local manufactoring. The chosen materials and manufacturing process must therefore be feasible in this setting.
The production process must be described in the projects documentation, basically making it a Production Requirements Document (PRD).
This description are done under the following assumptions:
Definition of Done
Documentation
Which part of the documentation needs to be updated or extended?
The text was updated successfully, but these errors were encountered: