You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Commit 8bdb28d
Browse filesBrowse the repository at this point in the historyBrowse files
Tiny follow-up to PR #77. Fixes the spike script's UTMOS gate computation to use a sample-matched clean mean (matches what the canonical report tables already publish), exposes both means in the JSON, and swaps a fragile design-doc line-number reference for a stable section heading.
Resolves 3 of 5 post-merge Copilot threads on #77 (all duplicates of the same UTMOS-population issue) plus the line-number-drift thread. The 5th thread (torch.hub trust_repo=True) is the 4th recurrence of an already-treated supply-chain concern (pinned + documented in #77 Limitations §8) and is intentionally not re-addressed.
No published PR #77 conclusions change — the report tables already used the correct paired comparison.
Copy file name to clipboardExpand all lines: docs/m17_phase_a_validation_report.md
+1-1Lines changed: 1 addition & 1 deletion
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -1,7 +1,7 @@
1
1
# M17 Phase A Validation Report — Whisper + UTMOS on Hebrew Clips
2
2
3
3
This report validates the Phase A acceptance criteria from the M17 design doc
4
-
(`docs/automated_eval_design.md`lines 418–422) before the E1/E2 module skeletons land.
4
+
(`docs/automated_eval_design.md`§"Acceptance Criteria") before the E1/E2 module skeletons land.
5
5
6
6
Generated: 2026-05-05. Raw data: `state/spikes/m17_phase_a/results.json` (gitignored). Auto-tables: `state/spikes/m17_phase_a/report_auto.md`. Listening samples: `state/spikes/m17_phase_a/<clip_id>__<degradation>.wav`. SHA-256 prefixes shown in the manifest are first-8-chars only — full hashes in `results.json`.
0 commit comments