Skip to content

DEPENDENCY UPGRADE: major upgrades — 5 packages (major: 4 · patch: 1) #3420

DEPENDENCY UPGRADE: major upgrades — 5 packages (major: 4 · patch: 1)

DEPENDENCY UPGRADE: major upgrades — 5 packages (major: 4 · patch: 1) #3420

Triggered via pull request February 13, 2026 07:37
Status Failure
Total duration 35s
Artifacts –

build.yml

on: pull_request
Matrix: unit-test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
lint
Process completed with exit code 1.
unit-test (18.12)
Process completed with exit code 1.
unit-test (22.11)
The strategy configuration was canceled because "unit-test._18_12" failed
unit-test (22.11)
The operation was canceled.
unit-test (20.19)
The strategy configuration was canceled because "unit-test._18_12" failed
unit-test (20.19)
The operation was canceled.
unit-test (24.11)
The strategy configuration was canceled because "unit-test._18_12" failed
unit-test (24.11)
The operation was canceled.