Skip to content

Comprehensive repository bug analysis and fix system #25

Comprehensive repository bug analysis and fix system

Comprehensive repository bug analysis and fix system #25

Triggered via pull request November 16, 2025 18:47
Status Failure
Total duration 48s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.8)
Process completed with exit code 1.
test (3.11)
The strategy configuration was canceled because "test._3_8" failed
test (3.11)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_8" failed
test (3.10)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_8" failed
test (3.9)
The operation was canceled.
code-quality
Process completed with exit code 1.
code-quality
Process completed with exit code 1.