Skip to content

Merge pull request #9 from BlastDock/claude/repo-bug-analysis-fixes-0… #23

Merge pull request #9 from BlastDock/claude/repo-bug-analysis-fixes-0…

Merge pull request #9 from BlastDock/claude/repo-bug-analysis-fixes-0… #23

Triggered via push November 16, 2025 17:59
Status Failure
Total duration 39s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.8)
Process completed with exit code 1.
test (3.11)
The strategy configuration was canceled because "test._3_8" failed
test (3.11)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_8" failed
test (3.10)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_8" failed
test (3.9)
The operation was canceled.
code-quality
Process completed with exit code 1.
code-quality
Process completed with exit code 1.